Location: Hai Son Industrial Zone, Duc Hoa, Long An
Location: Hai Son Industrial Zone, Duc Hoa, Long An
Operation date: 05/12/2021
Operation date: 05/12/2021
Installation capacity: 302 kWp
Installation capacity: 302 kWp

Location: Hai Son Industrial Zone, Duc Hoa, Long An
Location: Hai Son Industrial Zone, Duc Hoa, Long An
Operation date: 05/12/2021
Operation date: 05/12/2021
Installation capacity: 302 kWp
Installation capacity: 302 kWp