Location: Lot E, Street No. 2, Dong An Industrial Park, Binh Hoa Ward, Thuan An City, Binh Duong Province, Vietnam
Location: Lot E, Street No. 2, Dong An Industrial Park, Binh
Hoa Ward, Thuan An City, Binh Duong Province, Vietnam.
Operation date: 25/04/2024
Operation date: 25/04/2024
Installation capacity: 410kwp
Installation capacity: 420 kWp