Location: Road No. 3, Binh Hoa, Thuan An,
Binh Duong, Vietnam
Location: Road No. 3, Binh Hoa, Thuan An,
Binh Duong, Vietnam.
Operation Date: 16/09/2024
Operation Date: 16/09/2024
Installed Capacity: 1,104kwp
Installed Capacity: 1,104 kWp

Z6971977229392 A5ad84cf4d8bfd27058eb9f44fc8891b
Z6971977238503 E99674caedbe468a56e6232045af8636
Z6971977244230 3cb1cd1dda907d4e30346657218d29e0