Location: Lot N7-N10, N2 Street, Nam Tan Uyen Expanded IP, Tan
Uyen, Binh Duong, Vietnam
Location: Lot N7-N10, N2 Street, Nam Tan Uyen Expanded IP, Tan
Uyen, Binh Duong, Vietnam.
Operation date: 20/11/2024
Operation date: 20/11/2024
Installation capacity: 1,100kwp
Installation capacity: 1,100 kWp